Roofing & Truss System

This system outperforms traditional timber roof trusses by utilizing light gauge high-tensile steel.

Lightweight Steel Truss Systems

When building a proper home, the roof structure is critical. After all, the structure serves as a foundation. A house would not be able to stand on its own without it. Steel battens and steel c channel, also known as c section, c truss, or trusses, are two components of a Light Weight Steel Truss (LWST). Sysntech provides high-quality LWST systems to help build a strong home for you and your family.

Our Roofing System

High-Tensile Galvanized channels and purlins are used to construct our Lightweight Steel Truss System. Lightweight roof truss systems can be easily fabricated and assembled on-site, especially for long-span steel trusses where transportation is a significant issue. The lightweight steel truss’s simplicity makes it an easy task for skilled workers to complete. Because the roof truss system does not require painting, the actual construction time is reduced. The roofing truss is also rust-resistant. Additionally, this roofing system is termite and fire-resistant. Which makes this one of the cost-effective roofing systems.

Step 1:

Site Visit & Evaluation 


We determine the project's objectives during the site inspection. When our crew arrives with the necessary tools, they will take measurements, inspect the building completely, and then share their findings with you, the customer.

Step 2:

Proposal Submittal


Your allocated sales representative will collaborate with the team to configure a strategy that will best meet your needs using the information gathered during the site inspection. The project idea will subsequently be presented for evaluation.

Step 3:

Contract Execution


Our crew starts working as soon as the contract is signed! Designing, submitting, and getting Building & High Pile Plans approved is our area of expertise.

Step 4:

Permit Approval & Material Delivery


In order to ensure that we are prepared to start installation as soon as permits are obtained, our team schedules material deliveries to coincide with those dates.

Step 5:

Installation


We have a professional, bonded, and insured installation team. We promise that your project will be successfully completed from beginning to end since we will have a Project Manager, an Install Manager, and a Head Foreman on site.

Step 6:

Inspection By The City & Client Sign Off


We plan the inspection and final walkthrough when installation is finished. The project receives approval from the relevant department if everything is in order.

Drop Us A Message!

If you have any questions regarding our racking and boltless rack Klang drop us a message.